Level Two Commercial Rate - Schedule 4
Available:In all territory served by Umatilla Electric Cooperative in Umatilla, Morrow & Union Counties in Oregon.
Applicable:
To non-irrigation Customers that have a load size of 101 kW to 300 kW. Service shall be 60 cycle, alternating current at such voltage as the Cooperative has available.
Basic Charge:
$35.00 per billing month
Energy Charge:
4.37 cents per kWh
Less 0.7 cents per kWh for usages from 9:00 pm until 7:00 am and all day Sunday.
Demand Charge:
$4.50 per kW of HLH demand * per month.
Reactive Power Factor Charge:
If the average power factor is less than 97%, a power factor penalty shall be charged as follows:
1. Subtract the average power factor from 97%.
2. Multiply the result times the maximum kW demand.
3. Multiplying the result by $4.50 equals the power factor charge.
Harmonics Power Quality Charge:
A harmonics power quality charge may be billed by UEC Board Policy.
Franchise Taxes:
The amounts of any franchise fees or taxes levied on UEC by a quasi-municipal entity will be added to the customer's bill.
Minimum Charge:
The minimum monthly charge shall be the sum of the Basic, Energy, Demand, Harmonics, Franchise Taxes, and Power Factor Charges. A higher minimum may be required under contract to cover special conditions.
Continuing Service:
This schedule is based on continuing service at each service location. Disconnect and reconnect ransactions shall not operate to relieve a Customer from minimum monthly charges.
Rules and Regulations:
Service under this classification is subject to the General Rules and Regulations of the Cooperative.
* Definitions:
Maximum kW Demand is measured for the 30-minute period of the account's greatest use during the billing month. HLH Demand is the maximum monthly kW demand during the High Load Hours of 7:00 am through 9:00 pm Monday through Saturday.