Level One Commercial Rate - Schedule 3
Available:In all territory served by Umatilla Electric Cooperative in Umatilla, Morrow & Union Counties in Oregon.
Applicable:
To commercial customers that have a kW load size between 25 and 100 kW. Service shall be 60 cycle, alternating current at such voltage as the Cooperative has available.
Basic Charge:
$20.00 per billing month.
Energy Charge:
4.30 cents per kWh.
Demand Charges:
$4.50 per kW of metered maximum demand* per month
Reactive Power Factor Charge:
If the average power factor is less than 97%, a power factor penalty shall be charged as follows:
1. Subtract the average power factor from 97%.
2. Multiply the result times the metered maximum kW demand.*
3. Multiplying the result by $4.50 equals the power factor charge.
Harmonics Power Quality Charge:
A harmonics power quality charge may be billed by UEC Board Policy.
Franchise Taxes:
The amounts of any franchise fees or taxes levied on UEC by a quasi-municipal entity will be added to the customer's bill.
Minimum Charge:
The minimum monthly charge shall be the sum of the Basic, Energy, Demand, Franchise Taxes and Power Factor Charges. A higher minimum may be required under contract to cover special conditions.
Continuing Service:
This schedule is based on continuing service at each service location. If a customer disconnects a service for a period of time and then has the service reconnected, UEC will bill the customer for all minimum monthly charges that were not billed while the service was disconnected.
Rules and Regulations:
Service under this classification is subject to the Rules, Regulations and Policies of UEC.
* Definitions:
Metered Maximum Demand is measured or computed for the account's greatest kW use during the billing month.



